Extremely ambitious plans. To double the oil production by 2030 to 1MM B/D . To build pipelines and NG Liquefaction plants to Export natural gas to Asia and other locations.
If the drill baby drillpolicy takes place in the US and NG prices go down some local projects may be killed in the bud.