New Terminal at the Ezeiza

MilHojas

Registered
Joined
Oct 9, 2007
Messages
1,302
Likes
921

The construction is finished. The terminal will be open in March.
 
From http://www.reportur.com.ar/ (January 9, 2020): El “Zeppelin“, el nuevo sector de paraje del aeropuerto internacional de Ezeiza que sustituirá las terminales A y C y concentrará las partidas de los vuelos internacionales, ha finalizado su obra. Como el movimiento de vuelos de la temporada alta dificulta el traslado de las empresas que operan actualmente en ambas terminales, la inauguración deberá esperar un par de meses.

The “Zeppelin”, the new sector of the Ezeiza international airport that will replace terminals A and C and concentrate the departures of international flights, has completed its work. As the movement of high season flights makes it difficult to transfer the companies currently operating in both terminals, the inauguration must wait a couple of months. (I trust Google Translate more than myself.)

Looks like an improved way to get confused at Ezeiza.
 
Back
Top