scotttswan
Registered
- Joined
- Apr 16, 2010
- Messages
- 3,715
- Likes
- 3,543
Even the Brits knows and aknowledge quality, they could have gone the cheaper way ala Chinese trins but......Hitachi built trains are
way more superior. Craftmanship,safety,and low maintanance into the future. Japan's Bullet train "shinkansen" 50 years ongoing no accidents so far. High tech cost but worth it..
Kudos to England for capable decision..Cheers Brits !
It will cost an eye-watering £32billion, but the proposed high-speed rail project along the length of the country is being seen as 'a once-in-a-generation opportunity to transform the way we travel in Britain'.
The proposal is set to get the go-ahead today from ministers, setting in motion a plan to build the first phase from London to Birmingham through some of the south's most beautiful countryside.
The project, expected to be completed by 2026, will see trains travelling at 225mph, cutting the journey time between the two cities to just 49 minutes.
![]()
http://www.dailymail...opposition.html
meh, the corrupt cunts still sold off the profitable, highly rated publicly owned east coast line to their mates. Giving one company both "lines" from London up north.
http://www.bbc.com/news/business-30222458