After 5 months of work, the overhaul of China town is finally over.
From Juramento to Olazabal and Arribenos, the streets are brand new, pedestrian surface level is brought to the same as car level, the streets feel much wider.
New pavement is laid out and trees are planted, also benches are installed, cost 11 million pesos in total. A project pushed by Macri.
Barrio Chino started in 80s when Taiwanese first moved to here.
From Juramento to Olazabal and Arribenos, the streets are brand new, pedestrian surface level is brought to the same as car level, the streets feel much wider.
New pavement is laid out and trees are planted, also benches are installed, cost 11 million pesos in total. A project pushed by Macri.
Barrio Chino started in 80s when Taiwanese first moved to here.